The frequency types are used on work orders and checkpoints. By default, these are included, but you can freely add more. Please do not make changes to the four that are shown here.
When a work order or check point is created, the system suggests ‘Days’ as the frequency type. This can be overridden by the user. The frequency type with no. 99 – ‘As needed’ can be used in those cases where there is a job which does not have a fixed frequency/specific date on which it is performed, but which should be repeated as needed.