Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

From/to date field: Also note that estimated due date of meter-based jobs are included in these date fields. (To calculate the estimated due date, ‘Production/Week’ must be set in the equipment/asset card.). Note Fromdato includes jobs that are within the job's time window (from/to). E.g.: A search for jobs from/to 15.01 will include jobs that start before 15.01 and end after 15.01.

Asset search field: Search for asset number and asset name. Shows work orders connected to selected asset/structure. Search Selected Tree Only: Only generates hits for assets in selected tree.

...