List view of work orders with various sort, filter and search options, as well as the option to export to Excel.
Search field for free text: Includes search for work order number, the fields Short description, Description and Comments.
Shutdown: Filters out any jobs that require shutdown
w/o assignment: Provides a list of work orders with no assigned personnel. From this list, using the dedicated button, the user can easily move a job to ‘My work orders’, i.e. connect themselves as assigned personnel.
Breakdown: Provides a list of work orders connected to equipment for which shutdown has been registered in the event log. (Requires event log to be activated).
Work permit: Provides a list of work orders that require work permits. (Work permit function must be activated under the menu ‘Admin’ → 'System settings'.
From/to date field: Also note that estimated due date of meter-based jobs are included in these date fields. (To calculate the estimated due date, ‘Production/Week’ must be set in the equipment/asset card.)
Asset search field: Search for asset number and asset name. Shows work orders connected to selected asset/structure. Search Selected Tree Only: Only generates hits for assets in selected tree.
WO for this asset: Only shows work orders that are directly linked to selected asset.
Favourites: If favourite assets are set up, this will be displayed, and if you check this off, all work orders for these favourites will show in the list.
Display executed WOs: Also shows work orders with workflow status of ‘Executed’ in the list.
NB! Completed jobs must be approved before the job can go into history and any new recurring jobs are generated.
Mass update: Select one or more work orders in the work order list, click on the button to save the selected orders and the button for ‘Mass update’ will be shown – if you (the logged-on user) have access/rights to perform a mass update on work orders. This function has a range of ways to make the same change on several work orders in one operation.
For example, you can shadow-handle work orders, see also separate description regarding shadow handling.
Shadow Reference: Insert a separate reference number, or click on the button to generate a reference.
Shadow Buffer: Insert +/-% number so that the work order will be suppressed, provided that all new due categories fall within this shadow buffer.
Approve: If one or more work order is selected in the list, these can be approved in one operation via this button. (NB: This must be activated for the user under ‘User profiles’ → ‘Mass update’). Only allows you to set the same completion date on all work orders. For other details regarding approval, see separate description.
View Planner: Displays work orders in a separate planning window (Planner), allowing you to perform operations such as drag & drop, etc. For details, see separate description.
Export to Excel: Select one or more work orders for export to Excel. If none are selected, all of the work orders in the selection will be exported. Note that the selection of columns to be exported is also controlled by what the user has checked off in their user profile. The Excel sheet also allows you to perform a range of update imports via the import studio